When engaging All Class to successfully complete your building needs you are guaranteed a convenient, hassle free venture! #allclassbuilding

  • 301 Total Likes
  • 7 Tot. Comments
This week the boys completed a new structural wall to retain a soil erosion under the basement of one of our clients house. The previous owners excavated the base but failed to retain the soil so this started to cause minor structural damage. As you can see access was difficult so it was quite a challenging job but the end result turned out fantastic considering the limited working area. Check out the photos below!  #allclassbuilding #canberrabuilder #soilerosion #structural #completed #challenging #limitedaccess
This week the boys attended to a structural crack in the brickworks & render. They were able to fix it with structural rods & chemset. After fixing the crack they then applied new gyprock, installed new skirting and repainted. Check out the process below! #allclassbuilding #project #structuralcrackrepair #gyprock #skirting #painting #canberra #builder
Today the boys handed over our massive project at Spence! The initial planning stages of this project started in November 2017 with construction commencing in March. We would like to thank everyone that contributed to the success of this project. A big thank you to our team for their incredibly hard work over the past 7 months. And of course, a thank you to our wonderful client for trusting us to renovate their home.  Have a look at how the project turned out below! Watch this space for our next upcoming project!  #allclassbuilding #canberrabuilder #spence #project #complete #handover #thankyou #renovation #canberra
Yesterday the boys handed over the Yarralumla Project! After a full on month making sure the job was completed before our clients returned we are very happy with the outcome. A big thank you to everyone that helped us on this project. Thank you to our clients for letting us bring their dream kitchen to life!! #allclassbuilding #canberrabuilder #yarralumla #project #kitchenrenovation #thankyou #completed
Spence Project - Handover Next Friday, stay tuned for the handover photos. This project is a carpenters dream with superior workmanship and attention to detail the old school way! Cant wait to share this amazing project with everyone #carpentry #carpentryskills #build #building #plans #attentiontodetail #doublebrick #pavers #paving #allclassbuilding #lovecbr #cbr
Yarralumla Project- Handover Monday, Sneak peek of this weeks works #canberrabuilder #cleansite #allclassbuilding #rannai #kitchendesign #kitchenremodel #entrydoors #carpentry #timberfloors #cbr
This week at our Spence project we continued the paving of the driveway and internal painting. The boys finished all external trims, the balcony balustrade, fitted bathroom PC items as well as did a massive site clean up. Next week the boys look forward to completing the paving and painting!  #allclassbuilding #canberrabuilder #spence #paving #painting #bathroom #fitoff #externaltrims #balustrade #cleansite
Over at our Yarralumla project the kitchen joinery was installed - with the benchtops to go in next week - and the fireplace has been patched up ready for a new Rinnai gas fireplace to be fitted. We hope you enjoy the long weekend! ☀️ #allclassbuilding #canberrabuilder #yarralumla #kitchen #joinery #install #fireplace #longweekend
This week at our Spence project the electricians and painters are into the fit out, the driveway is nearly paved and all internal doors and trims are complete. Now off to relax for a long weekend! #allclassbuilding #canberrabuilder #spence #driveway #fitoff #electrical #painting #trimscomplete #longweekend
Today the boys have started a new project in Yarralumla. It consists of a new kitchen, entry doors, awning, replacing a wood fire place with a Rinnai gas fire heater & repairs to water damaged floors. Check out the before photos below! #allclassbuilding #canberrabuilder #yarralumla #newproject #newkitchen #repairs
Our Spence project was full on this week! Tiling progressed to the ensuite & powder room & the plumbing fit off started. The installation was completed of the new hot water system, downpipes, new air con unit (as well as relocation of the existing one), underfloor heating to breezeway & link, new French doors linking the new addition/existing dwelling, vanities & shaving cabinet to the ensuite & powder rooms. The boys even managed to finish the lining boards to the carport area. We couldn’t have asked for a more productive week!! #allclassbuilding #canberrabuilder #spence #productiveweek #tiling #aircon #underfloorheating #vanities #shavingcabinet #liningboards #frenchdoors #plumbingfitoff
Another busy week at Spence! The paving has continued and the bathroom, powder room and bedding are now ready for the floor tiling. The completion of lining boards to ceiling in new addition, acid wash of bricks and wall and ceiling insulation. Thank goodness it’s Friday!  #allclassbuilding #canberrabuilder #spence #busyweek #morepaving #readyfortile #tgif #acidwashdone #liningboard #wall&ceilinginsulation
Another huge week at over at Spence! The roof tiles and framework for the deck were completed and we have started on the paving, sheeting and wet sealing of wet areas. Have a look at the progress photos below!  #allclassbuilding #canberrabuilder #spence #hugeweek #hardwork #wetseal #rooftiles #deckframework #paving #sheeting #progressphotos
This week at our Spence project the boys have worked round the clock to get the trusses up and install the fascia and guttering. We are now ready for roof tiling come Monday morning!  #allclassbuilding #canberrabuilder #spence #hardwork #trussesup #fasciainstalled #gutteringinstalled #readyforrooftiles #goteam
It has been a huge week at Spence to say the least! After the concrete pour the boys straight away got stuck into putting up the trusses to the main addition. They’re hoping to get the trusses up to the new carport tomorrow....before the rain kicks in! #allclassbuilding #canberrabuilder #massiveweek #trussesup #workingweekend #pleasedontrain #spence
Today we reached a big milestone at our Spence project. We now have all 400m2 of concrete poured ready for our paved and tiled areas. We would like to say a huge thank you to Jag Pumping and CAB Concreting for giving us a hand during this massive pour!! #allclassbuilding #canberrabuilder #spence #concrete #bigmilestone #massivethanks #appreciation #hardwork #readytopave #readytotile
At Spence this week the external brickwork and internal framework has gone up! Just in time before the rain hits....now off to a relaxing weekend 🛠🌧 #allclassbuilding #canberrabuilder #internalframework #externalbrickwork #spence #weekendtime #beattherain
This week the boys have done a tremendous job and pulled up the existing driveway, doug trenches for the storm water, pour concrete for footpaths around the house/driveway and finished the inside skin of the brick work. The site is now ready for the structural beams and drainage! #allclassbuilding #canberrabuilder #hardwork #demoexistingdriveway #dougtrenches #siteready